Planejamento e Controle da Manutenção: Implantação de Alternativa para Redução de Paradas em Prensa Hidráulica

dc.contributor.advisorROSA, Jorge Luiz
dc.contributor.authorMENEZES, João Pedro Campos Pacheco de
dc.contributor.authorMOREIRA, Victor Silva
dc.contributor.otherGODOY, João Maurício
dc.contributor.otherRIBEIRO, Lúcia de Almeida
dc.date.accessioned2025-05-20T13:56:29Z
dc.date.available2025-05-20T13:56:29Z
dc.date.issued2021-12-09
dc.description.abstractA pesquisa discorre sobre um dos principais assuntos relacionados com a gestão da Manutenção Industrial, o planejamento e controle da manutenção, que realiza os planos táticos e estratégicos para garantir que as políticas de manutenção sejam cumpridas eficientemente, além do controle operacional das intervenções para que tudo saia conforme o planejado. Foi realizado um estudo de caso em uma área produtiva de uma metalúrgica da região, selecionando um equipamento específico (Prensa Hidráulica) utilizada no forjamento de cilindros. Do estudo preliminar com base em dados de paradas de produção no período de janeiro de 2021 até setembro de 2021, constatou-se que a causa principal das paradas era devido a vazamento de emulsão de óleo solúvel que tem a função de alimentar as garrafas de alta pressão que tornam a prensa hidráulica capaz de forjar cilindros utilizando alta pressão para operação adequada. A alimentação das garrafas de alta pressão é feita por uma bomba de deslocamento positivo do tipo êmbolo triplex sendo que o problema de vazamento constatado era justamente por falhas nas gaxetas de vedação destes êmbolos. A alternativa proposta e implantada foi a instalação de uma bomba de baixa pressão que se encontrava disponível, com a finalidade exclusiva de compensar o volume de óleo e manter a taxa de diluição constante e conforme o recomendado para operação da prensa. A implantação se deu a partir de setembro/2021 e está em acompanhamento com vistas a redefinição do programa de paradas programadas, uma vez que está havendo uma redução no número de paradas operacionais.pt_BR
dc.description.abstractThis work discusses one of the main issues related to the management of Industrial Maintenance, maintenance planning and control, which carries out tactical and strategic plans to ensure that maintenance policies are efficiently complied with, in addition to the operational control of interventions so that everything occurs as planned. A case study was carried out in a productive area of a metallurgical plant in the region, selecting specific equipment (Hydraulic Press) used in the forging of cylinders. From the preliminary study based on data from production stoppages in the period from January 2021 to September 2021, it was found that the main cause of the stoppages was due to the leakage of soluble oil emulsion, which has the function of feeding the high-water bottles. pressure that make the hydraulic press capable of forging cylinders using high pressure for proper operation. The feeding of the high pressure bottles is made by a triplex piston type positive displacement pump and the leakage problem was found to be due to failures in the sealing gaskets of these pistons.The alternative proposed and implemented was the installation of a low pressure pump that was available, with the sole purpose of compensating the oil volume and keeping the dilution rate constant and as recommended for the press operation. The implementation took place as of September/2021 and is being monitored with a view to redefining the scheduled shutdown program, since there is a reduction in the number of operational shutdowns.pt_BR
dc.description.sponsorshipCurso Superior de Tecnologia em Manutenção Industrialpt_BR
dc.identifier.citationMENEZES, J. P. C. P.; MOREIRA, V. S. Planejamento e Controle da Manutenção: Implantação de Alternativa para Redução de Paradas em Prensa Hidráulica, 2021. Trabalho de Graduação (Curso de Manutenção Industrial). Faculdade de Tecnologia de Pindamonhangaba. Pindamonhangaba, 2021.pt_BR
dc.identifier.urihttps://ric.cps.sp.gov.br/handle/123456789/32692
dc.language.isopt_BRpt_BR
dc.publisher133pt_BR
dc.subjectManutençãopt_BR
dc.subject.otherControle e Processos Industriaispt_BR
dc.titlePlanejamento e Controle da Manutenção: Implantação de Alternativa para Redução de Paradas em Prensa Hidráulicapt_BR
dc.title.alternativeMaintenance Planning and Control: Implementation of an alternative to reduce downtime in a Hydraulic Presspt_BR
dc.typeMonografiapt_BR
dcterms.type-pt_BR

Arquivos

Pacote original

Agora exibindo 1 - 1 de 1
Carregando...
Imagem de Miniatura
Nome:
tecnologiaemmanutencaoindustrial_2021_2_joaopedrocampospachecodemenezes_victorsilvamoreira_monografia_maximizandoeficienciaenergeticaemsistemas.pdf
Tamanho:
1.09 MB
Formato:
Adobe Portable Document Format

Licença do pacote

Agora exibindo 1 - 1 de 1
Carregando...
Imagem de Miniatura
Nome:
license.txt
Tamanho:
365 B
Formato:
Item-specific license agreed upon to submission
Descrição:
Governo do Estado de SP